Project Details
This page displays current information for project DEA: 081G6704.
Project Information
| Project Identifiers | Project ID: 995493 DEA: 081G6704 EFIS: 0816000049 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-79-5.4/11.4 |
| Award Date | 05/23/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC. |
| Location Description | RIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD |
| QA Service Level | 1 (Verified on 12/18/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 89 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-01-102 | 10/01/2025 | 10/01/2025 | Acceptance | Soil | View |
| 2026-02-06-19 | 02/06/2026 | 02/10/2026 | Quality Assurance | Concrete | View |
| 2026-01-22-36 | 01/22/2026 | 01/26/2026 | Quality Assurance | Concrete | View |
| 2026-01-15-35 | 01/15/2026 | 01/20/2026 | Quality Assurance | Concrete | View |
| 2026-01-15-34 | 01/15/2026 | 01/15/2026 | Acceptance | Aggregate | View |
| 2026-01-08-31 | 01/08/2026 | 01/08/2026 | Acceptance | Aggregate | View |
| 2025-12-23-15 | 12/23/2025 | 12/23/2025 | Acceptance | Aggregate | View |
| 2026-01-08-14 | 01/08/2026 | 01/12/2026 | Quality Assurance | Concrete | View |
| 2025-09-15-115 | 09/15/2025 | 09/18/2025 | Verification | Asphalt Binder | View |
| 2025-12-23-6 | 12/23/2025 | 12/24/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
