Project Details
This page displays current information for project DEA: 07357304.
Project Information
| Project Identifiers | Project ID: 994962 DEA: 07357304 EFIS: 0719000062 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-6.6/13.1 |
| Award Date | 04/27/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE CONCRETE SLABS AND MEDIAN BARRIER, |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, DOWNEY AND CITY OF COMMERCE FROM 0.2 MILE SOUTH OF ROUTE 5/605 SEPARATION TO 0.1 MILE NORT |
| QA Service Level | 1 (Verified on 07/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| martin.oregel@dot.ca.gov | Martin Oregel | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 162 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-04-91 | 09/04/2025 | 09/08/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-09-03-110 | 09/03/2025 | 09/08/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-09-03-109 | 09/03/2025 | 09/05/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-09-02-113 | 09/02/2025 | 09/05/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-28-87 | 08/28/2025 | 09/02/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-05-108 | 08/05/2025 | 08/26/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-31-84 | 07/31/2025 | 08/26/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-26-104 | 08/26/2025 | 08/27/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-22-82 | 08/22/2025 | 08/27/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-22-81 | 08/22/2025 | 08/27/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
