Project Details
This page displays current information for project DEA: 081J2304.
Project Information
| Project Identifiers | Project ID: 994944 DEA: 081J2304 EFIS: 0818000002 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-60-R1.0/12.0 |
| Award Date | 09/20/2023 |
| Closeout Date | 04/28/2025 |
| Work Description | RAMP METERING SYSTEM, HMA (TYPE A), RDWY EXC, MOD SIGNAL & LTG SYSTEMS |
| Location Description | RIVERSIDE COUNTY IN AND NEAR JURUPA VALLEY AND RIVERSIDE AT VARIOUS LOCATIONS FROM WINEVILLE ROAD UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 60/91 SEPARATION |
| QA Service Level | 1 (Verified on 07/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mahfual.alam@dot.ca.gov | Mahfual Alam | Resident Engineer | Caltrans RE DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 11-20 of 141 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-22-127 | 08/22/2024 | 08/26/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-12-114 | 08/12/2024 | 08/22/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-25-93 | 09/25/2024 | 09/25/2024 | Acceptance | Aggregate | View |
| 2024-09-24-100 | 09/24/2024 | 09/24/2024 | Acceptance | Aggregate | View |
| 2024-10-01-71 | 10/01/2024 | 10/01/2024 | Acceptance | Soil | View |
| 2024-10-02-69 | 10/02/2024 | 10/02/2024 | Quality Control | Aggregate | View |
| 2024-10-03-31 | 10/03/2024 | 10/04/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-10-03-23 | 10/03/2024 | 10/04/2024 | Production Start-Up | Aggregate | View |
| 2024-08-22-108 | 08/22/2024 | 08/23/2024 | Acceptance | Aggregate | View |
| 2024-08-12-107 | 08/12/2024 | 08/19/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||