Project Details
This page displays current information for project DEA: 101F1804.
Project Information
| Project Identifiers | Project ID: 994875 DEA: 101F1804 EFIS: 1016000077 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-4-R16.0/R19.4 |
| Award Date | 09/20/2023 |
| Closeout Date | Not set |
| Work Description | BRIDGE WORK, CONCRETE BARRIER, AND INSTALL RAMP METER SYSTEM. |
| Location Description | SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF ROUTE 4/5 SEPARATION TO 0.4 MILE WEST OF ROUTE 4/99 SEPARATION |
| QA Service Level | 1 (Verified on 06/14/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tofael.anwar@dot.ca.gov | Toafael Anwar | Resident Engineer | Caltrans RE DB |
| Ron.Matin@dot.ca.gov | Ron Matin | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-17 of 17 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-11-27-4 | 11/27/2024 | 12/02/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2024-07-16-52 | 07/16/2024 | 07/17/2024 | Quality Assurance | Concrete | View |
| 2024-06-21-1 | 06/21/2024 | 06/24/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2024-04-23-32 | 04/23/2024 | 04/23/2024 | Quality Assurance | Roadway/Bridge Surface | View |
| 2024-04-02-3 | 04/02/2024 | 04/03/2024 | Quality Control | SMTL TM5 - Welded Hoops | View |
| 2024-04-02-2 | 04/02/2024 | 04/05/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2024-01-31-34 | 01/31/2024 | 02/08/2024 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
