Project Details
This page displays current information for project DEA: 010C5004.
Project Information
| Project Identifiers | Project ID: 994751 DEA: 010C5004 EFIS: 0112000292 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-11.3/34.6 |
| Award Date | 03/02/2023 |
| Closeout Date | Not set |
| Work Description | Project Name: Bridge Rail Replacement - 3 Bridges |
| Location Description | Hely Creek, Little Larabee Creek and Butte Creek Bridge. |
| QA Service Level | 1 (Verified on 04/27/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| joaquin.s.rodriguez@dot.ca.gov | Joaquin Rodriguez | Resident Engineer | Caltrans RE DB |
| shantanu.nalawade@dot.ca.gov | Shantanu Nalawade | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 30 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-08-32 | 04/08/2025 | 04/11/2025 | Verification | Asphalt Binder | View |
| 2025-04-09-4 | 04/09/2025 | 04/09/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2024-09-18-27 | 09/18/2024 | 09/18/2024 | Quality Assurance | Roadway/Bridge Surface | View |
| 2024-07-17-86 | 07/17/2024 | 07/31/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2024-07-02-3 | 07/02/2024 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
| 2024-07-02-2 | 07/02/2024 | 07/02/2024 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2024-04-23-41 | 04/23/2024 | 04/25/2024 | Department Acceptance | Asphalt Rubber Binder | View |
| 2024-04-23-29 | 04/23/2024 | 04/23/2024 | Department Acceptance | Asphalt Binder | View |
| 2024-04-19-16 | 04/19/2024 | 04/23/2024 | Department Acceptance | Asphalt Binder | View |
| 2024-04-08-8 | 04/08/2024 | 04/08/2024 | Department Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
