Project Details
This page displays current information for project DEA: 081H4914.
Project Information
| Project Identifiers | Project ID: 994589 DEA: 081H4914 EFIS: 0819000118 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-18-53.1/69.0 |
| Award Date | 05/16/2023 |
| Closeout Date | 08/01/2024 |
| Work Description | REPLACE AC SURF, HMA (TYPE A), AND COLD CENTRAL PLANT RECYCLING. |
| Location Description | SAN BERNARDINO COUNTY NEAR BIG BEAR LAKE FROM 0.4 MILE EAST OF PINEVIEW DRIVE TO 0.1 MILE NORTH OF RICHARD STREET AND VISALIA AVENUE |
| QA Service Level | 1 (Verified on 07/14/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| alfonso.gonzalez@dot.ca.gov | Alfonso Gonzalez | Resident Engineer | Caltrans RE DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 11-20 of 23 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-09-14-28 | 09/14/2023 | 09/18/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-09-13-23 | 09/13/2023 | 09/14/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-09-11-11 | 09/11/2023 | 09/12/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-09-08-20 | 09/08/2023 | 09/11/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-09-06-36 | 09/06/2023 | 09/11/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-09-07-38 | 09/07/2023 | 09/08/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-08-30-44 | 08/30/2023 | 09/01/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-08-29-51 | 08/29/2023 | 09/01/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-08-28-18 | 08/28/2023 | 08/29/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-08-23-62 | 08/23/2023 | 08/25/2023 | Production Start-Up | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods