Project Details
This page displays current information for project DEA: 030H3704.
Project Information
| Project Identifiers | Project ID: 994546 DEA: 030H3704 EFIS: 0315000151 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-65-R0.5/1.8 |
| Award Date | 06/08/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA, RHMA & CONC CURB/SIDEWALK, INSTALL & MODIFY SIGNAL SYSTEMS. |
| Location Description | YUBA COUNTY NEAR WHEATLAND FROM 0.2 MILE SOUTH OF MAIN STREET TO GRASSHOPPER SLOUGH BRIDGE |
| QA Service Level | 1 (Verified on 05/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dustin.watts@dot.ca.gov | Dustin Watts | Resident Engineer | Caltrans RE DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-13 of 13 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-09-51 | 07/09/2024 | 07/10/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-17-112 | 06/17/2024 | 06/28/2024 | Acceptance | Asphalt Binder | View |
| 2024-06-17-111 | 06/17/2024 | 06/19/2024 | Production Start-Up | Hot Mix Asphalt | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
