Project Details

This page displays current information for project DEA: 081A8304.

Project Information

Project IdentifiersProject ID: 994441
DEA: 081A8304
EFIS: 0800000579
COOP: 081746
DIST-CO-RTE-PM08---
Award Date10/05/2022
Closeout DateNot set
Work DescriptionWidening the existing Cedar Avenue overcrossing (OC) from 6 to 10 lanes, replacing the Union Pacific Railroad overhead (OH), widening Cedar Avenue from 4 to 6 through lanes, and realigning and/or widening the interchange entrance and exit ramps
Location DescriptionAt the Interstate 10 (I-10) Cedar Avenue Interchange from PM 17.8 to 19.3 in the County of San Bernardino (County)
QA Service Level2 (Verified on 12/13/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
kee.ooi@dot.ca.govKee OoiResident EngineerCaltrans RE DB
Kenneth.Loncharich@wsp.comKenneth LoncharichOversight Resident EngineerCaltrans REO DB
matt.bruce@dot.ca.govMatt BruceStructural RepresentativeCaltrans SR DB
Ali.El-Zaynab@wsp.comAli El-ZaynabOversight Structural RepresentativeCaltrans SRO DB
jennifer.olarte@dot.ca.govJennifer OlarteMETS REPCaltrans METS REP DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 11-19 of 19 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-08-02-3908/02/202308/03/2023Quality ControlConcreteView
2023-06-21-2406/21/202306/22/2023Quality ControlConcreteView
2023-06-19-2406/19/202306/20/2023Quality ControlConcreteView
2023-06-15-2106/15/202306/16/2023Quality ControlConcreteView
2023-06-13-4106/13/202306/14/2023Quality ControlConcreteView
2023-06-09-1806/09/202306/10/2023Quality ControlConcreteView
2023-06-07-4306/07/202306/08/2023Quality ControlConcreteView
2023-06-05-3506/05/202306/06/2023Quality ControlConcreteView
2023-06-05-3006/05/202306/05/2023Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods