Project Details
This page displays current information for project DEA: 033J3304.
Project Information
| Project Identifiers | Project ID: 994358 DEA: 033J3304 EFIS: 0322000251 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-12-0/0.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | MMBN Project. Replace backup drive system, replace lift span deck, install hydraulic barrier system and new generator, replace electrical control system, install new traffic gates and elevators, traffic control, |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 10/25/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ephrem.teweldeberhan@dot.ca.gov | Ephrem Tweldeberham | Resident Engineer | Caltrans RE DB |
| rusty.danna@dot.ca.gov | Rusty D'Anna | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 33 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-08-1 | 06/08/2025 | 06/08/2025 | Quality Assurance | Concrete | View |
| 2025-05-11-2 | 05/11/2025 | 05/11/2025 | Quality Assurance | Concrete | View |
| 2025-05-11-1 | 05/11/2025 | 05/11/2025 | Quality Assurance | Concrete | View |
| 2025-05-06-2 | 05/06/2025 | 05/08/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-05-05-8 | 05/05/2025 | 05/05/2025 | Acceptance | SMTL TM6 - Steel Check Sample Plate | View |
| 2025-05-05-6 | 05/05/2025 | 05/05/2025 | Acceptance | SMTL TM6 - Steel Check Sample Plate | View |
| 2025-04-27-5 | 04/27/2025 | 04/28/2025 | Quality Assurance | Concrete Core | View |
| 2025-04-28-8 | 04/28/2025 | 05/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-04-28-7 | 04/28/2025 | 05/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-04-28-6 | 04/28/2025 | 05/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
