Project Details
This page displays current information for project DEA: 081G4704.
Project Information
| Project Identifiers | Project ID: 994327 DEA: 081G4704 EFIS: 0816000001 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-3.1/53.5 |
| Award Date | 01/02/2023 |
| Closeout Date | Not set |
| Work Description | STRUCTURAL CONC BR, CONC SLAB, HMA (TYPE A), ALT CRASH CUSHION SYSTEM. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE AT MORRILL CANYON BRIDGE AND NEAR HEMET AT STRAWBERRY CREEK BRIDGE. |
| QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mike.bergevin@dot.ca.gov | Mike A Bergevin | Resident Engineer | Caltrans RE DB |
| arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 101 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-30-67 | 07/30/2024 | 07/30/2024 | Acceptance | Soil | View |
| 2024-06-28-58 | 06/28/2024 | 06/28/2024 | Acceptance | Aggregate | View |
| 2024-06-28-46 | 06/28/2024 | 07/02/2024 | Quality Assurance | Concrete | View |
| 2024-05-08-100 | 05/08/2024 | 06/07/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-05-08-99 | 05/08/2024 | 05/09/2024 | Acceptance | Aggregate | View |
| 2024-05-05-14 | 05/05/2024 | 05/06/2024 | Acceptance | Aggregate | View |
| 2024-05-05-13 | 05/05/2024 | 05/06/2024 | Acceptance | Aggregate | View |
| 2024-05-04-10 | 05/04/2024 | 05/04/2024 | Acceptance | Aggregate | View |
| 2024-06-03-83 | 06/03/2024 | 06/03/2024 | Acceptance | Aggregate | View |
| 2024-06-10-91 | 06/10/2024 | 06/10/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
