Project Details
This page displays current information for project DEA: 080R1704.
Project Information
| Project Identifiers | Project ID: 994311 DEA: 080R1704 EFIS: 0812000028 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R25.0/R50.0 |
| Award Date | 04/04/2023 |
| Closeout Date | 05/30/2025 |
| Work Description | CONSTRUCT CSP, CSPA, SSPPA, STR CONC HW, IB, BFM, RSP, & MGS. |
| Location Description | SAN BERNARDINO COUNTY AT NEWBERRY SPRINGS AND LUDLOW FROM 1.6 MILES EAST OF FORT CADY ROAD OVERCROSSING TO CRUCERO ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 100 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-11-04-50 | 11/04/2024 | 11/04/2024 | Quality Assurance | Soil | View |
| 2024-11-04-49 | 11/04/2024 | 11/04/2024 | Quality Assurance | Soil | View |
| 2024-11-04-48 | 11/04/2024 | 11/04/2024 | Quality Assurance | Soil | View |
| 2024-11-01-38 | 11/01/2024 | 11/01/2024 | Quality Assurance | Soil | View |
| 2024-11-01-37 | 11/01/2024 | 11/01/2024 | Quality Assurance | Soil | View |
| 2024-11-01-36 | 11/01/2024 | 11/11/2024 | Quality Assurance | Soil | View |
| 2024-11-01-35 | 11/01/2024 | 10/01/2024 | Quality Assurance | Soil | View |
| 2024-11-06-29 | 11/06/2024 | 11/13/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-11-05-31 | 11/05/2024 | 11/13/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-11-04-44 | 11/04/2024 | 11/13/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
