Project Details
This page displays current information for project DEA: 081G8304.
Project Information
| Project Identifiers | Project ID: 994191 DEA: 081G8304 EFIS: 0816000079 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R100.8/R101.8 |
| Award Date | 02/07/2023 |
| Closeout Date | 08/29/2025 |
| Work Description | HMA, STRUCTURAL CONC, BAR REINFORCING STEEL, CRSP & IMPORTED BORROW. |
| Location Description | SAN BERNARDINO COUNTY AT ESSEX FROM 1.1 MILES EAST OF ESSEX ROAD OVERCROSSING TO 0.5 MILE EAST OF HALFWAY HILLS WASH BRIDGE |
| QA Service Level | 1 (Verified on 03/30/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| anthony.v.doan@dot.ca.gov | Anthony Doan | Resident Engineer | Caltrans RE DB |
| jegbefume.adodo@dot.ca.gov | Jegbefume Adodo | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 352 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-01-07-12 | 01/07/2025 | 01/07/2025 | Quality Assurance | Soil | View |
| 2025-01-07-9 | 01/07/2025 | 01/07/2025 | Quality Assurance | Soil | View |
| 2024-10-11-92 | 10/11/2024 | 10/12/2024 | Quality Control | Concrete | View |
| 2024-10-11-91 | 10/11/2024 | 10/12/2024 | Quality Control | Concrete | View |
| 2024-10-11-90 | 10/11/2024 | 10/12/2024 | Quality Control | Concrete | View |
| 2024-10-11-89 | 10/11/2024 | 10/12/2024 | Quality Control | Concrete | View |
| 2024-10-14-90 | 10/14/2024 | 10/15/2024 | Quality Control | Concrete | View |
| 2024-10-14-89 | 10/14/2024 | 10/15/2024 | Quality Control | Concrete | View |
| 2024-10-14-88 | 10/14/2024 | 10/15/2024 | Quality Control | Concrete | View |
| 2024-10-14-87 | 10/14/2024 | 10/15/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
