Project Details
This page displays current information for project DEA: 043J0624.
Project Information
| Project Identifiers | Project ID: 993804 DEA: 043J0624 EFIS: 0419000534 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101-16.5/23.0 |
| Award Date | 08/24/2022 |
| Closeout Date | 04/10/2024 |
| Work Description | COLD PLANE AND PLACE HMA, REPLACE GUARDRAIL AND CURB RAMPS. |
| Location Description | SAN MATEO COUNTY AT VARIOUS LOCATION FROM BROADWAY OVERCROSSING TO 0.2 MILE NORTH OF OYSTER POINT BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 05/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| douglas.inori@dot.ca.gov | Douglas Inori | Resident Engineer | Caltrans RE DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 111 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-10-16-63 | 10/16/2023 | 10/17/2023 | Quality Assurance | Aggregate | View |
| 2023-10-13-70 | 10/13/2023 | 10/16/2023 | Quality Assurance | Aggregate | View |
| 2023-10-12-86 | 10/12/2023 | 10/13/2023 | Quality Assurance | Aggregate | View |
| 2023-10-11-126 | 10/11/2023 | 10/12/2023 | Quality Assurance | Aggregate | View |
| 2023-10-10-106 | 10/10/2023 | 10/11/2023 | Quality Assurance | Aggregate | View |
| 2023-10-09-88 | 10/09/2023 | 10/10/2023 | Quality Assurance | Aggregate | View |
| 2023-10-06-73 | 10/06/2023 | 10/09/2023 | Quality Assurance | Aggregate | View |
| 2023-10-05-89 | 10/05/2023 | 10/06/2023 | Quality Assurance | Aggregate | View |
| 2023-10-04-96 | 10/04/2023 | 10/05/2023 | Production Start-Up | Aggregate | View |
| 2023-10-03-105 | 10/03/2023 | 10/04/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
