Project Details
This page displays current information for project DEA: 120R2004.
Project Information
Project Identifiers | Project ID: 993511 DEA: 120R2004 EFIS: 1218000065 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-0.0/2.0 |
Award Date | 04/14/2022 |
Closeout Date | 06/19/2024 |
Work Description | PLACE PRECAST CONCRETE PAVEMENT AND REPLACE CONCRETE SLAB. |
Location Description | ORANGE COUNTY IN SAN CLEMENTE FROM ORANGE COUNTY LINE TO 0.4 MILE NORTH OF EL CAMINO REAL UNDERCROSSING |
QA Service Level | 1 (Verified on 01/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mona.shahidi@dot.ca.gov | Mona Shahidi | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 57 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-01-17-20 | 01/17/2023 | 01/18/2023 | Quality Control | Concrete | View |
2023-01-13-45 | 01/13/2023 | 01/16/2023 | Quality Control | Concrete | View |
2023-01-11-53 | 01/11/2023 | 01/12/2023 | Quality Control | Concrete | View |
2023-01-09-13 | 01/09/2023 | 01/10/2023 | Quality Control | Concrete | View |
2023-01-07-14 | 01/07/2023 | 01/09/2023 | Quality Control | Concrete | View |
2023-01-06-38 | 01/06/2023 | 01/09/2023 | Quality Control | Concrete | View |
2023-01-04-28 | 01/04/2023 | 01/05/2023 | Quality Control | Concrete | View |
2022-12-30-21 | 12/30/2022 | 01/03/2023 | Quality Control | Concrete | View |
2022-12-29-13 | 12/29/2022 | 12/29/2022 | Quality Control | Concrete | View |
2022-12-28-16 | 12/28/2022 | 12/29/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods