Project Details
This page displays current information for project DEA: 07323404.
Project Information
| Project Identifiers | Project ID: 993387 DEA: 07323404 EFIS: 0716000064 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-R59.5/R67.9 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | PLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| oscar.osorio@dot.ca.gov | Oscar Osorio | Resident Engineer | Caltrans RE DB |
| chanh.tong@dot.ca.gov | Chanh Tong | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 329 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-14-47 | 07/14/2025 | 07/18/2025 | Verification | Aggregate | View |
| 2025-06-18-82 | 06/18/2025 | 06/18/2025 | Acceptance | Concrete | View |
| 2025-06-04-98 | 06/04/2025 | 06/04/2025 | Acceptance | Concrete | View |
| 2025-06-18-30 | 06/18/2025 | 06/19/2025 | Acceptance | Soil | View |
| 2025-06-11-68 | 06/11/2025 | 06/12/2025 | Acceptance | Concrete | View |
| 2025-06-16-17 | 06/16/2025 | 06/17/2025 | Acceptance | Soil | View |
| 2025-06-14-1 | 06/14/2025 | 06/14/2025 | Acceptance | Soil | View |
| 2025-06-11-1 | 06/11/2025 | 06/11/2025 | Acceptance | Soil | View |
| 2025-06-07-1 | 06/07/2025 | 06/07/2025 | Acceptance | Soil | View |
| 2025-06-05-22 | 06/05/2025 | 06/05/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
