Project Details
This page displays current information for project DEA: 050A0904.
Project Information
| Project Identifiers | Project ID: 993169 DEA: 050A0904 EFIS: 0513000028 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-156-R1.4/R2.0 |
| Award Date | 12/14/2021 |
| Closeout Date | 07/31/2024 |
| Work Description | WIDEN REINFORCED STRUCTURAL CONCRETE BRIDGE & REPLACE BRIDGE RAILING. |
| Location Description | MONTEREY COUNTY IN AND NEAR CASTROVILLE FROM 0.3 MILE EAST OF ROUTE 156/183 SEPARATION TO 0.2 MILE EAST OF CASTROVILLE BOULEVARD |
| QA Service Level | 1 (Verified on 08/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| david.hopper@dot.ca.gov | David Hopper | Resident Engineer | Caltrans RE DB |
| dean.russu@dot.ca.gov | Dean Russu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 41 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-08-02-74 | 08/02/2023 | 08/03/2023 | Quality Assurance | Concrete | View |
| 2022-08-19-79 | 08/19/2022 | 08/19/2022 | Quality Control | Concrete | View |
| 2023-06-26-80 | 06/26/2023 | 06/27/2023 | Quality Assurance | Concrete | View |
| 2023-06-14-2 | 06/14/2023 | 06/15/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2023-06-14-1 | 06/14/2023 | 06/15/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2023-05-22-2 | 05/22/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2023-05-22-1 | 05/22/2023 | 05/25/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2023-04-28-5 | 04/28/2023 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2023-04-28-4 | 04/28/2023 | 05/02/2023 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2023-04-14-17 | 04/14/2023 | 04/15/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
