Project Details
This page displays current information for project DEA: 040A1854.
Project Information
| Project Identifiers | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-7.1/8.1 |
| Award Date | 02/12/2013 |
| Closeout Date | 01/03/2017 |
| Work Description | RECONSTRUCT INTERCHANGE |
| Location Description | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING |
| QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hal.j.streater@dot.ca.gov | Hal Streater | Resident Engineer | Caltrans RE DB |
| jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-19 of 19 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2014-09-05-2 | 09/05/2014 | 09/09/2014 | Quality Control | Concrete | View |
| 2014-09-05-1 | 09/05/2014 | 09/09/2014 | Quality Control | Concrete | View |
| 2014-08-28-7 | 08/28/2014 | 09/04/2014 | Quality Control | Concrete | View |
| 2014-08-28-6 | 08/28/2014 | 09/04/2014 | Quality Control | Concrete | View |
| 2014-08-28-5 | 08/28/2014 | 09/04/2014 | Quality Control | Concrete | View |
| 2014-08-28-4 | 08/28/2014 | 09/04/2014 | Quality Control | Concrete | View |
| 2013-11-19-8307297 | 11/19/2013 | 11/20/2013 | Verification | Concrete | View |
| 2013-11-15-8305233 | 11/15/2013 | 11/18/2013 | Verification | Concrete | View |
| 2013-11-13-7032 | 11/13/2013 | 11/14/2013 | Verification | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
