Project Details
This page displays current information for project DEA: 051N3504.
Project Information
Project Identifiers | Project ID: 215710 DEA: 051N3504 EFIS: 0520000173 |
---|---|
DIST-CO-RTE-PM | 05-SLO-101-37.8/46.0, 37.0/46.0 |
Award Date | 06/09/2021 |
Closeout Date | 09/06/2022 |
Work Description | Replace concrete pavement with precast concrete panels. |
Location Description | Near Atascadero on US 101 from 0.1 mile south of Route 58/10 separation to Traffic Way. |
QA Service Level | 1 (Verified on 07/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
drussu@mnsengineers.com | Dean Russu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 74 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-18-22 | 01/18/2022 | 01/19/2022 | Quality Control | Concrete | View |
2022-01-13-35 | 01/13/2022 | 01/14/2022 | Quality Control | Concrete | View |
2022-01-13-34 | 01/13/2022 | 01/14/2022 | Quality Control | Concrete | View |
2022-01-12-61 | 01/12/2022 | 01/13/2022 | Quality Control | Concrete | View |
2022-01-12-60 | 01/12/2022 | 01/13/2022 | Quality Control | Concrete | View |
2022-01-11-52 | 01/11/2022 | 01/12/2022 | Quality Control | Concrete | View |
2022-01-11-51 | 01/11/2022 | 01/12/2022 | Quality Control | Concrete | View |
2022-01-10-49 | 01/10/2022 | 01/11/2022 | Quality Control | Concrete | View |
2022-01-10-48 | 01/10/2022 | 01/11/2022 | Quality Control | Concrete | View |
2022-01-08-6 | 01/08/2022 | 01/10/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods