Project Details
This page displays current information for project DEA: 07333004.
Project Information
| Project Identifiers | Project ID: 215314 DEA: 07333004 EFIS: 0716000298 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,5-15.1/22.9 |
| Award Date | 10/20/2022 |
| Closeout Date | 08/20/2025 |
| Work Description | PROJECT PILOT 1 |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES ON ROUTE 5 FROM 0.1 MILE SOUTH OF CALZONA STREET TO 0.1 MILE SOUTH OF RIVERSIDE DRIVE AND ROUTE 2 AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
| QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jerome.g.arabe@dot.ca.gov | Jerome Arabe | Resident Engineer | Caltrans RE DB |
| gon.choi@bureauveritas.com | Gon Choi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 75 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-04-09-76 | 04/09/2024 | 04/09/2024 | Quality Control | Aggregate | View |
| 2024-04-08-61 | 04/08/2024 | 04/08/2024 | Quality Control | Aggregate | View |
| 2024-03-28-45 | 03/28/2024 | 04/09/2024 | Department Acceptance | Aggregate | View |
| 2024-04-08-41 | 04/08/2024 | 04/08/2024 | Quality Control | Aggregate | View |
| 2024-03-29-35 | 03/29/2024 | 03/29/2024 | Quality Control | Aggregate | View |
| 2024-03-27-53 | 03/27/2024 | 03/29/2024 | Verification | Asphalt Binder | View |
| 2024-03-28-26 | 03/28/2024 | 03/29/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-03-27-29 | 03/27/2024 | 03/29/2024 | Verification | Aggregate | View |
| 2024-03-27-27 | 03/27/2024 | 03/29/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-03-20-49 | 03/20/2024 | 03/21/2024 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
