Project Details
This page displays current information for project DEA: 07332604.
Project Information
| Project Identifiers | Project ID: 215221 DEA: 07332604 EFIS: 0716000287 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-R12.4/14.9 |
| Award Date | 12/16/2020 |
| Closeout Date | 11/25/2024 |
| Work Description | REMOVE RAISED ISLAND, CONSTRUCT CONCRETE BARRIER AND INSTALL LIGHTING. |
| Location Description | THE COUNTY AND CITY OF LOS ANGELES FROM 0.1 MILE EAST OF ARLINGTON AVENUE OVERCROSSING TO 0.7 MILE EAST OF ROUTE 10/110 SEPARATION |
| QA Service Level | 1 (Verified on 03/19/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| gilbert.trujillo@dot.ca.gov | Gilbert Trujillo | Resident Engineer | Caltrans RE DB |
| bernabe.contreras@dot.ca.gov | Bernabe Contreras | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 44 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-06-29-39 | 06/29/2022 | 06/29/2022 | Department Acceptance | Soil | View |
| 2022-07-01-42 | 07/01/2022 | 07/01/2022 | Department Acceptance | Soil | View |
| 2022-07-06-45 | 07/06/2022 | 07/07/2022 | Department Acceptance | Concrete | View |
| 2022-06-28-37 | 06/28/2022 | 06/29/2022 | Department Acceptance | Concrete | View |
| 2022-07-08-3 | 07/08/2022 | 07/08/2022 | Quality Assurance | Concrete | View |
| 2022-07-08-2 | 07/08/2022 | 07/08/2022 | Quality Assurance | Concrete | View |
| 2022-06-16-40 | 06/16/2022 | 06/16/2022 | Department Acceptance | Soil | View |
| 2022-06-29-9 | 06/29/2022 | 06/29/2022 | Department Acceptance | Soil | View |
| 2022-06-23-14 | 06/23/2022 | 06/24/2022 | Department Acceptance | Soil | View |
| 2022-06-16-12 | 06/16/2022 | 06/16/2022 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
