Project Details
This page displays current information for project DEA: 080R1424.
Project Information
| Project Identifiers | Project ID: 215050 DEA: 080R1424 EFIS: 0815000201 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R125.0/R154.6 |
| Award Date | 08/26/2020 |
| Closeout Date | 11/01/2022 |
| Work Description | ROADWAY EXCAVATION, IMPORT BORROW AND REGRADE THE MEDIAN SLOPE. |
| Location Description | SAN BERNARDINO COUNTY FROM 4.5 MILES EAST OF HOMER WASH BRIDGE TO ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 40 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-02-24-17 | 02/24/2022 | 03/10/2022 | Quality Assurance | Concrete | View |
| 2022-02-24-13 | 02/24/2022 | 02/24/2022 | Quality Assurance | Aggregate | View |
| 2022-02-24-12 | 02/24/2022 | 02/24/2022 | Quality Control | Aggregate | View |
| 2022-01-12-57 | 01/12/2022 | 01/12/2022 | Quality Control | Concrete | View |
| 2021-12-16-21 | 12/16/2021 | 01/13/2021 | Quality Control | Concrete | View |
| 2021-12-21-17 | 12/21/2021 | 01/18/2021 | Quality Control | Concrete | View |
| 2021-12-16-5 | 12/16/2021 | 12/16/2021 | Quality Control | Aggregate | View |
| 2021-12-14-1 | 12/14/2021 | 12/14/2021 | Quality Assurance | Aggregate | View |
| 2021-12-13-9 | 12/13/2021 | 12/13/2021 | Quality Assurance | Soil | View |
| 2021-12-13-8 | 12/13/2021 | 12/13/2021 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
