Project Details
This page displays current information for project DEA: 050L7224.
Project Information
| Project Identifiers | Project ID: 214989 DEA: 050L7224 EFIS: 0515000098 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-1-34.5 |
| Award Date | 10/13/2021 |
| Closeout Date | 11/25/2024 |
| Work Description | REPLACE BRIDGE. |
| Location Description | SAN LUIS OBISPO COUNTY NEAR MORRO BAY AT OLD CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| rick.silva@dot.ca.gov | Rick Silva | Resident Engineer | Caltrans RE DB |
| sal.heredia@dot.ca.gov | Sal Heredia | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 21 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-08-01-5 | 08/01/2022 | 08/02/2022 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
| 2022-08-01-4 | 08/01/2022 | 08/02/2022 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
| 2022-07-19-6 | 07/19/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2022-07-18-2 | 07/18/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2022-07-18-1 | 07/18/2022 | 07/25/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2022-07-05-2 | 07/05/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2022-07-05-1 | 07/05/2022 | 07/11/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2022-06-14-3 | 06/14/2022 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2022-06-14-2 | 06/14/2022 | 06/17/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2022-06-01-2 | 06/01/2022 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
