Project Details
This page displays current information for project DEA: 030F2844.
Project Information
| Project Identifiers | Project ID: 214701 DEA: 030F2844 EFIS: 0319000204 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
| Award Date | 05/14/2020 |
| Closeout Date | 11/27/2023 |
| Work Description | Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
| chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
| mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 87 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-01-12-5 | 01/12/2021 | 01/13/2021 | Quality Assurance | Concrete | View |
| 2021-01-11-2 | 01/11/2021 | 01/13/2021 | Quality Assurance | Concrete | View |
| 2020-12-30-3 | 12/30/2020 | 01/04/2021 | Quality Assurance | Concrete | View |
| 2020-12-29-1 | 12/29/2020 | 01/04/2021 | Quality Assurance | Concrete | View |
| 2020-12-23-4 | 12/23/2020 | 12/24/2020 | Quality Assurance | Concrete | View |
| 2020-12-22-4 | 12/22/2020 | 12/24/2020 | Quality Assurance | Concrete | View |
| 2020-12-12-2 | 12/12/2020 | 12/18/2020 | Department Acceptance | Asphaltic Emulsion | View |
| 2020-12-08-1 | 12/08/2020 | 12/10/2020 | Quality Assurance | Concrete | View |
| 2020-12-02-1 | 12/02/2020 | 12/03/2020 | Quality Assurance | Concrete | View |
| 2020-11-25-2 | 11/25/2020 | 11/30/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods