Project Details
This page displays current information for project DEA: 030F2854.
Project Information
| Project Identifiers | Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
| Award Date | 04/06/2020 |
| Closeout Date | 10/30/2020 |
| Work Description | Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
| chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 42 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-03-31-3 | 03/31/2020 | 04/01/2020 | Quality Control | Concrete | View |
| 2020-03-30-5 | 03/30/2020 | 03/31/2020 | Quality Control | Concrete | View |
| 2020-03-27-15 | 03/27/2020 | 03/28/2020 | Quality Control | Concrete | View |
| 2020-03-26-20 | 03/26/2020 | 03/27/2020 | Quality Control | Concrete | View |
| 2020-03-25-15 | 03/25/2020 | 03/26/2020 | Quality Control | Concrete | View |
| 2020-03-24-9 | 03/24/2020 | 03/25/2020 | Quality Control | Concrete | View |
| 2020-03-23-9 | 03/23/2020 | 03/24/2020 | Quality Control | Concrete | View |
| 2020-03-20-22 | 03/20/2020 | 03/21/2020 | Quality Control | Concrete | View |
| 2020-03-19-14 | 03/19/2020 | 03/20/2020 | Quality Control | Concrete | View |
| 2020-03-18-19 | 03/18/2020 | 03/19/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
