Project Details
This page displays current information for project DEA: 07301504.
Project Information
| Project Identifiers | Project ID: 213603 DEA: 07301504 EFIS: 0714000020 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1,10-R34.6/35.2,R2.1/18.4 |
| Award Date | 11/19/2018 |
| Closeout Date | 01/18/2022 |
| Work Description | REPLACING CONCRETE AND AC PAVEMENT |
| Location Description | LOS ANGELES COUNTY IN SANTA MONICA AND LOS ANGELES ON ROUTE 1 FROM 0.1 MILE WEST OF MAIN STREET OVERCROSSING TO ROUTE 1/10 SEPARATION AND ON ROUTE 10 FROM ROUTE 1/10 SEPARATION TO ROUTE 5/10 SEPARATION AND AT ROUTE 10/110 SEPARATION |
| QA Service Level | 1 (Verified on 07/26/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mahinda.ram@dot.ca.gov | Mahinda Ram | Resident Engineer | Caltrans RE DB |
| frank.lotfi@dot.ca.gov | Frank Lotfi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-19 of 19 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-08-29-7 | 08/29/2019 | 09/04/2019 | Verification | Aggregate | View |
| 2019-07-15-6 | 07/15/2019 | 07/17/2019 | Verification | Aggregate | View |
| 2019-06-29-5 | 06/29/2019 | 07/03/2019 | Verification | Aggregate | View |
| 2019-06-29-4 | 06/29/2019 | 07/03/2019 | Verification | Aggregate | View |
| 2019-06-29-3 | 06/29/2019 | 07/03/2019 | Verification | Aggregate | View |
| 2019-06-29-2 | 06/29/2019 | 07/03/2019 | Verification | Aggregate | View |
| 2019-05-24-5 | 05/24/2019 | 05/29/2019 | Verification | Aggregate | View |
| 2019-05-24-4 | 05/24/2019 | 05/29/2019 | Verification | Aggregate | View |
| 2019-05-08-19 | 05/08/2019 | 05/16/2019 | Verification | Aggregate | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
