Project Details
This page displays current information for project DEA: 080H4704.
Project Information
| Project Identifiers | Project ID: 213477 DEA: 080H4704 EFIS: 0812000074 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-2-2.44 |
| Award Date | 09/28/2018 |
| Closeout Date | 01/18/2022 |
| Work Description | WIDEN BRIDGE TO ACCOMMODATE STANDARD SHOULDERS |
| Location Description | AT WRIGHTWOOD AT SHEEP CREEK BRIDGE |
| QA Service Level | 1 (Verified on 12/31/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| john.santos@dot.ca.gov | John Santos | Resident Engineer | Caltrans RE DB |
| md.rahman@dot.ca.gov | Md Rahman | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-11 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-03-27-3 | 03/27/2019 | 03/27/2019 | Control Sample | Paint | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
