Project Details
This page displays current information for project DEA: 07296404.
Project Information
| Project Identifiers | Project ID: 212827 DEA: 07296404 EFIS: 0713000031 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,10,60-16.1/17.0,18.1/18.4,0.4/R1.0 |
| Award Date | 01/18/2018 |
| Closeout Date | 09/03/2020 |
| Work Description | PLACE ROCK BLANKET, MINOR CONCRETE, AND WEED CONTROL MAT. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES ON ROUTE 5 FROM EUCLID AVENUE UNDERCROSSING TO SEVENTH STREET OVERCROSSING AND ON ROUTE 10 FROM LA RIVER TO ROUTE 5 AND ON ROUTE 60 FROM SOTO STREET UNDERCROSSING TO EAST OF EUCLID AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 06/14/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hassan.azima@dot.ca.gov | Hassan Azima | Resident Engineer | Caltrans RE DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 11-14 of 14 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-11-12-21 | 11/12/2019 | 11/19/2019 | Verification | Aggregate | View |
| 2019-11-12-20 | 11/12/2019 | 11/19/2019 | Verification | Aggregate | View |
| 2019-11-12-19 | 11/12/2019 | 11/19/2019 | Verification | Aggregate | View |
| 2019-10-12-3 | 10/12/2019 | 10/14/2019 | Quality Assurance | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
