Project Details
This page displays current information for project DEA: 024G5004.
Project Information
| Project Identifiers | Project ID: 212657 DEA: 024G5004 EFIS: 0214000031 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-299-1.9-2.3 |
| Award Date | 10/01/2019 |
| Closeout Date | 11/24/2021 |
| Work Description | VIADUCT WIDENING |
| Location Description | TRINITY COUNTY NEAR SALYER FROM 0.1 MILE EAST TO 0.6 MILE EAST OF WHITE HOUSE GULCH ROAD |
| QA Service Level | 1 (Verified on 09/04/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mandhir.grewal@dot.ca.gov | Mandhir Grewal | Resident Engineer | Caltrans RE DB |
| mike.mccracken@dot.ca.gov | Michael Mccracken | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 29 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-08-10-9 | 08/10/2020 | 08/10/2020 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2020-08-03-9 | 08/03/2020 | 08/04/2020 | Retest | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2020-06-18-34 | 06/18/2020 | 07/16/2020 | Retest | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2020-06-18-33 | 06/18/2020 | 07/10/2020 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2020-03-20-1 | 03/20/2020 | 03/27/2020 | Department Acceptance | SMTL TM5 - Headed Bars | View |
| 2020-03-03-4 | 03/03/2020 | 03/13/2020 | Quality Control | SMTL TM5 - Welded Hoops | View |
| 2020-03-03-3 | 03/03/2020 | 03/13/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2020-03-03-2 | 03/03/2020 | 03/13/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2020-03-03-1 | 03/03/2020 | 03/13/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2017-07-12-9 | 07/12/2017 | 08/25/2017 | Quality Control | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
