Project Details
This page displays current information for project DEA: 044G1154.
Project Information
| Project Identifiers | Project ID: 212654 DEA: 044G1154 EFIS: 0417000130 COOP: 42655 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-680-R6.8/R21.9 |
| Award Date | 02/06/2018 |
| Closeout Date | 06/06/2019 |
| Work Description | RAMP METERING AND TRAFFIC OPERATION SYSTEMS (TOS) |
| Location Description | ALAMEDA COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILES NORTH OF MISSION SAN JOSE SEPARATION (MISSION BLVD/RTE 238) TO 0.3 MILES NORTH OF ALCOSTA BLVD. OVERCROSSING |
| QA Service Level | 1 (Verified on 02/13/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kharakbir.sandhu@dot.ca.gov | Kharakbir Sandhu | Resident Engineer | Caltrans RE DB |
| Kharakbir.Sandhu@dot.ca.gov | Kharakbir Sandhu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-18 of 18 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-09-05-8 | 09/05/2018 | 09/07/2018 | Quality Assurance | Concrete | View |
| 2018-08-24-6 | 08/24/2018 | 08/23/2018 | Quality Assurance | Concrete | View |
| 2018-08-24-5 | 08/24/2018 | 08/30/2018 | Quality Assurance | Concrete | View |
| 2018-08-20-13 | 08/20/2018 | 08/23/2018 | Quality Assurance | Concrete | View |
| 2018-08-20-12 | 08/20/2018 | 08/23/2018 | Quality Assurance | Concrete | View |
| 2018-08-10-6 | 08/10/2018 | 08/14/2018 | Quality Assurance | Concrete | View |
| 2018-06-01-5 | 06/01/2018 | 06/05/2018 | Quality Assurance | Concrete | View |
| 2018-06-01-4 | 06/01/2018 | 06/05/2018 | Quality Assurance | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
