Project Details
This page displays current information for project DEA: 080Q7904.
Project Information
| Project Identifiers | Project ID: 211237 DEA: 080Q7904 EFIS: 0800020481 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R93.1/94.2 |
| Award Date | 06/03/2016 |
| Closeout Date | 05/03/2018 |
| Work Description | REPLACE HOFF WASH BRIDGE (BRIDGE NUMBER 54-0889L/R) |
| Location Description | SAN BERNARDINO COUNTY FROM 0.3 MILE WEST TO 0.4 MILE EAST OF HOFF WASH BRIDGE |
| QA Service Level | 1 (Verified on 07/01/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
| leonard.romero@dot.ca.gov | Leonard Romero | Structural Representative | Caltrans SR DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 11-12 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-11-28-3 | 11/28/2016 | 11/30/2016 | Quality Assurance | Concrete | View |
| 2016-10-31-3 | 10/31/2016 | 11/08/2016 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
