Project Details
This page displays current information for project DEA: 07286204.
Project Information
| Project Identifiers | Project ID: 210227 DEA: 07286204 EFIS: 0713000217 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-138-56.20/55.20 |
| Award Date | 03/14/2019 |
| Closeout Date | 01/13/2023 |
| Work Description | WIDEN ROUTE 138 TO 4 LANES WITH A MEDIAN TURN LANE AND STANDARD WIDTH SHOULDERS.; DRAINAGE IMPROVEMENTS. |
| Location Description | IN LOS ANGELES COUNTY IN PALMDALE FROM 87TH STREET EAST TO 96TH STREET EAST |
| QA Service Level | 1 (Verified on 06/27/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| fred.tieu@dot.ca.gov | Fred Tieu | Resident Engineer | Caltrans RE DB |
| george.boules@dot.ca.gov | George Boules | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-11 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-06-01-7 | 06/01/2020 | 06/09/2020 | Verification | Aggregate | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
