Project Details
This page displays current information for project DEA: 100X2104.
Project Information
| Project Identifiers | Project ID: 209170 DEA: 100X2104 EFIS: 1012000181 |
|---|---|
| DIST-CO-RTE-PM | 10-ALP,AMA,CAL-70,162-Var |
| Award Date | 01/23/2014 |
| Closeout Date | 04/09/2018 |
| Work Description | CONSTRUCT WASH BUILDINGS. |
| Location Description | ALPINE, AMADOR, AND CALAVERAS COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 12/05/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| colin.doran@dot.ca.gov | Colin Doran | Resident Engineer | Caltrans RE DB |
| alfredo.carranza@dot.ca.gov | Alfredo Carranza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 28 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-01-06-3 | 01/06/2015 | 01/09/2015 | Quality Control | Concrete | View |
| 2015-01-06-2 | 01/06/2015 | 01/09/2015 | Quality Control | Concrete | View |
| 2015-01-06-1 | 01/06/2015 | 01/09/2015 | Quality Control | Concrete | View |
| 2014-11-26-1 | 11/26/2014 | 12/02/2014 | Quality Control | Concrete | View |
| 2014-10-15-5 | 10/15/2014 | 11/12/2014 | Quality Control | Concrete | View |
| 2014-10-15-4 | 10/15/2014 | 11/12/2014 | Quality Control | Concrete | View |
| 2014-10-30-5 | 10/30/2014 | 11/04/2014 | Quality Control | Concrete | View |
| 2014-10-30-4 | 10/30/2014 | 11/04/2014 | Quality Control | Concrete | View |
| 2014-10-30-3 | 10/30/2014 | 11/04/2014 | Quality Control | Concrete | View |
| 2014-09-16-8 | 09/16/2014 | 10/16/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
