Project Details

This page displays current information for project DEA: 081L2404.

Project Information

Project IdentifiersProject ID: 1001468
DEA: 081L2404
EFIS: 0819000167
DIST-CO-RTE-PM08-SBD-95-R57.2/64.5
Award Date10/09/2025
Closeout Date09/03/2026
Work DescriptionRHMA (GAP GRADED), REPLACE AC SURFACING, AND COLD PLANE AC PVMT.
Location DescriptionSAN BERNARDINO COUNTY NEAR NEEDLES FROM ROUTE 40/95 SEPARATION TO 0.5 MILE NORTH OF GOFFS ROAD
QA Service Level1 (Verified on 08/29/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
anthony.v.doan@dot.ca.govAnthony DoanResident EngineerCaltrans RE DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer
brian.teh@dot.ca.govBrian TehDistrict Materials Engineer - SRL STS and Field Lab BlytheCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 11-20 of 54 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-04-23-4704/23/202604/23/2026AcceptanceAggregateView
2026-04-22-5904/22/202604/22/2026AcceptanceAggregateView
2026-04-21-5604/21/202604/21/2026AcceptanceAggregateView
2026-04-20-3504/20/202604/20/2026AcceptanceAggregateView
2026-04-17-3904/17/202604/17/2026AcceptanceAggregateView
2026-04-16-5804/16/202604/16/2026AcceptanceAggregateView
2026-04-15-5704/15/202604/15/2026AcceptanceAggregateView
2026-04-14-4004/14/202604/14/2026AcceptanceAggregateView
2026-04-13-3404/13/202604/13/2026AcceptanceAggregateView
2026-04-23-4604/23/202604/23/2026AcceptanceHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods