Project Details
This page displays current information for project DEA: 030J5204.
Project Information
| Project Identifiers | Project ID: 1001389 DEA: 030J5204 EFIS: 0319000293 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV,PLA-20-Var |
| Award Date | 11/17/2025 |
| Closeout Date | Not set |
| Work Description | CAPITAL PREVENTIVE MAINTENANCE (CAPM) - COLD PLANE AC PVMT, HMA (TYPE A), & DRAINAGE SYSTEMS. |
| Location Description | NEVADA AND PLACER COUNTIES AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF DOW ROAD TO 0.5 MILE EAST OF YUBA PASS SEPARATION AND OVERHEAD |
| QA Service Level | 1 (Verified on 07/21/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| lucas.price@dot.ca.gov | Lucas Price | Resident Engineer | Caltrans RE DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 23 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-06-25-50 | 06/25/2026 | 06/26/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-06-24-36 | 06/24/2026 | 06/26/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-06-23-34 | 06/23/2026 | 06/26/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-06-25-10 | 06/25/2026 | 06/25/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-06-24-1 | 06/24/2026 | 06/24/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-06-23-1 | 06/23/2026 | 06/23/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-06-08-27 | 06/08/2026 | 06/18/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-06-01-85 | 06/01/2026 | 06/18/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-06-03-37 | 06/03/2026 | 06/04/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-06-02-49 | 06/02/2026 | 06/04/2026 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
