Project Details
This page displays current information for project DEA: 051H4404.
Project Information
| Project Identifiers | Project ID: 1001194 DEA: 051H4404 EFIS: 0516000074 |
|---|---|
| DIST-CO-RTE-PM | 05-SB,SLO-1-50.3/50.6,0.0/0.3 |
| Award Date | 09/30/2025 |
| Closeout Date | Not set |
| Work Description | SANTA MARIA RIVER BRIDGE (REPLACE). |
| Location Description | SANTA BARBARA AND SAN LUIS OBISPO COUNTIES IN AND NEAR GUADALUPE AT SANTA MARIA RIVER BRIDGE |
| QA Service Level | 1 (Verified on 06/02/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jacob.cooper@dot.ca.gov | Jacob Cooper | Resident Engineer | Caltrans RE DB |
| sal.heredia@dot.ca.gov | Sal Heredia | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 29 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-07-08-37 | 07/08/2026 | 07/08/2026 | Quality Control | Aggregate | View |
| 2026-06-19-48 | 06/19/2026 | 06/19/2026 | Quality Control | Precast Concrete | View |
| 2026-06-25-102 | 06/25/2026 | 06/25/2026 | Quality Control | Precast Concrete | View |
| 2026-07-08-3 | 07/08/2026 | 07/08/2026 | Quality Control | SMTL TM5 - Welded Hoops | View |
| 2026-07-08-2 | 07/08/2026 | 07/09/2026 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2026-07-07-43 | 07/07/2026 | 07/07/2026 | Quality Control | Precast Concrete | View |
| 2026-06-22-74 | 06/22/2026 | 07/07/2026 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2026-06-22-59 | 06/22/2026 | 06/22/2026 | Quality Control | Aggregate | View |
| 2026-06-22-58 | 06/22/2026 | 06/22/2026 | Quality Control | Aggregate | View |
| 2026-06-22-57 | 06/22/2026 | 06/22/2026 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
