Project Details
This page displays current information for project DEA: 072XR204.
Project Information
| Project Identifiers | Project ID: 1001104 DEA: 072XR204 EFIS: 0725000163 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1-VAR |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | BID ITEM : STEEL SOLDIER PILE (W12X120) ASTM A992 Gr 50, Bare Steel, 100% Domestic 38 PILES AVAILABLE IMMEDIATELY FROM STOCK 37 PILES AVAILABLE FROM FUTURE MILL ROLL OF 3/16/25 Supplied as: 75 EA. @ 33'9" |
| Location Description | PCH |
| QA Service Level | 1 (Verified on 03/10/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Steven.Z.Zaw@dot.ca.gov | Steve Zaw | Resident Engineer | Caltrans RE DB |
| Mehrzad.Moheb@dot.ca.gov | Mehrzad Moheb | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 25 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-18-75 | 07/18/2025 | 07/18/2025 | Acceptance | Concrete | View |
| 2025-08-08-18 | 08/08/2025 | 08/11/2025 | Quality Control | Concrete | View |
| 2025-08-07-38 | 08/07/2025 | 08/08/2025 | Quality Control | Concrete | View |
| 2025-08-06-65 | 08/06/2025 | 08/07/2025 | Quality Control | Concrete | View |
| 2025-08-05-64 | 08/05/2025 | 08/06/2025 | Quality Control | Concrete | View |
| 2025-08-04-59 | 08/04/2025 | 08/05/2025 | Quality Control | Concrete | View |
| 2025-07-30-44 | 07/30/2025 | 07/31/2025 | Quality Control | Concrete | View |
| 2025-07-28-45 | 07/28/2025 | 07/29/2025 | Quality Control | Concrete | View |
| 2025-08-01-11 | 08/01/2025 | 08/04/2025 | Quality Control | Concrete | View |
| 2025-07-29-65 | 07/29/2025 | 07/30/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
