Project Details
This page displays current information for project DEA: 081N7704.
Project Information
| Project Identifiers | Project ID: 1001001 DEA: 081N7704 EFIS: 0823000047 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-173-L0.0/L7.7 |
| Award Date | 04/25/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PVMT, HMA (TYPE A), AND REPLACE AC SURFACING. |
| Location Description | SAN BERNARDINO COUNTY IN HESPERIA FROM ROUTE 138 TO 0.5 MILE EAST OF ARROWHEAD LAKE ROAD |
| QA Service Level | 1 (Verified on 04/07/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 32 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-15-38 | 08/15/2025 | 08/19/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-06-68 | 08/06/2025 | 08/08/2025 | Verification | Asphalt Binder | View |
| 2025-08-12-72 | 08/12/2025 | 08/14/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-11-25 | 08/11/2025 | 08/14/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-05-69 | 08/05/2025 | 08/06/2025 | Verification | Asphalt Binder | View |
| 2025-08-08-5 | 08/08/2025 | 08/10/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-07-18 | 08/07/2025 | 08/08/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-05-48 | 08/05/2025 | 08/07/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-06-45 | 08/06/2025 | 08/08/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-08-05-41 | 08/05/2025 | 08/06/2025 | Production Start-Up | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
