Project Details
This page displays current information for project DEA: 081K6904.
Project Information
| Project Identifiers | Project ID: 1000607 DEA: 081K6904 EFIS: 0819000090 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-5.7/11.8 |
| Award Date | 01/09/2025 |
| Closeout Date | Not set |
| Work Description | ROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM. |
| Location Description | RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Fereydoon.Alipanah@dot.ca.gov | Fereydoon Alipanah | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 164 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-06-27-17 | 06/27/2026 | 06/30/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-06-28-17 | 06/28/2026 | 06/30/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-06-27-13 | 06/27/2026 | 06/30/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-05-30-15 | 05/30/2026 | 05/30/2026 | Acceptance | Soil | View |
| 2026-05-30-14 | 05/30/2026 | 05/30/2026 | Acceptance | Soil | View |
| 2026-06-25-27 | 06/25/2026 | 07/02/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2026-06-25-25 | 06/25/2026 | 07/02/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2026-06-25-22 | 06/25/2026 | 07/02/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2026-06-22-18 | 06/22/2026 | 06/23/2026 | Quality Assurance | Concrete | View |
| 2026-05-30-5 | 05/30/2026 | 06/01/2026 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
