Project Details

This page displays current information for project DEA: 11430904.

Project Information

Project IdentifiersProject ID: 1000575
DEA: 11430904
EFIS: 1119000199
DIST-CO-RTE-PM11-SD-5,805-Var
Award Date02/12/2025
Closeout DateNot set
Work DescriptionRESURFACE BRIDGE, REPLACE BRIDGE BARRIER, MGS, AND MODIFY ELECT.
Location DescriptionSAN DIEGO COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 04/04/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Navid.Borzouei@dot.ca.govNavid BorzoueiResident EngineerCaltrans RE DB
julien.atallah@dot.ca.govJulien AtallahMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 11-20 of 20 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2025-08-06-7308/06/202508/07/2025Quality ControlConcreteView
2025-08-05-8608/05/202508/06/2025Quality ControlConcreteView
2025-07-15-12907/15/202507/16/2025Quality ControlConcreteView
2025-07-14-11907/14/202507/15/2025Quality ControlConcreteView
2025-07-13-2107/13/202507/14/2025Quality ControlConcreteView
2025-07-02-6807/02/202507/03/2025Quality ControlConcreteView
2025-08-20-5108/20/202508/27/2025Quality ControlPolyesterView
2025-05-29-10205/29/202505/30/2025Quality ControlConcreteView
2025-06-18-1006/18/2025Quality AssuranceSMTL TM5 - CouplersView
2025-06-18-806/18/202507/18/2025Quality AssuranceSMTL TM5 - CouplersView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods