Project Details
This page displays current information for project DEA: 11430384.
Project Information
| Project Identifiers | Project ID: 1000402 DEA: 11430384 EFIS: 1118000114 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-23.7/28.5 |
| Award Date | 10/09/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE DRAINAGE, CONCRETE PAVEMENT, AND MODIFY ELECTRICAL SYSTEMS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION TO ROUTE 5/805 SEPARATION |
| QA Service Level | 1 (Verified on 11/18/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| karl.hartline@dot.ca.gov | Karl Hartline | Resident Engineer | Caltrans RE DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 57 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-02-128 | 06/02/2025 | 06/02/2025 | Quality Control | Aggregate | View |
| 2025-06-03-106 | 06/03/2025 | 06/03/2025 | Quality Control | Concrete | View |
| 2025-06-02-127 | 06/02/2025 | 06/03/2025 | Quality Control | Concrete | View |
| 2025-05-28-127 | 05/28/2025 | 05/29/2025 | Quality Control | Concrete | View |
| 2025-11-17-4 | 11/17/2025 | 11/20/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-11-17-3 | 11/17/2025 | 11/20/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-10-09-42 | 10/09/2025 | 10/10/2025 | Quality Control | Polyester | View |
| 2025-09-15-67 | 09/15/2025 | 09/24/2025 | Per Request | Aggregate | View |
| 2025-09-15-66 | 09/15/2025 | 09/24/2025 | Per Request | Hot Mix Asphalt | View |
| 2025-09-24-55 | 09/24/2025 | 09/30/2025 | Per Request | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
