Project Details
This page displays current information for project DEA: 081M8504.
Project Information
| Project Identifiers | Project ID: 1000179 DEA: 081M8504 EFIS: 0822000054 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-111-0.0/18.5 |
| Award Date | 05/15/2024 |
| Closeout Date | 01/06/2025 |
| Work Description | RHMA (GAP-GRADED), COLD PLANE AC PVMT, THERMOPLASTIC TRAFFIC STRIPE. |
| Location Description | RIVERSIDE COUNTY AT SALTON SEA FROM IMPERIAL COUNTY LINE TO 0.1 MILE NORTH OF 66TH AVENUE |
| QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Khoi.vu@dot.ca.gov | Khoi Vu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 56 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-18-28 | 09/18/2024 | 09/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-17-35 | 09/17/2024 | 09/19/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-09-05-86 | 09/05/2024 | 09/10/2024 | Verification | Asphalt Rubber Binder | View |
| 2024-09-16-34 | 09/16/2024 | 09/17/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-10-70 | 09/10/2024 | 09/12/2024 | Verification | Asphalt Rubber Binder | View |
| 2024-08-29-53 | 08/29/2024 | 09/10/2024 | Verification | Asphalt Rubber Binder | View |
| 2024-09-10-65 | 09/10/2024 | 09/12/2024 | Verification | Asphalt Binder | View |
| 2024-09-15-1 | 09/15/2024 | 09/16/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-11-43 | 09/11/2024 | 09/13/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-09-50 | 09/09/2024 | 09/13/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
