Project Details
This page displays current information for project DEA: 060Y1304.
Project Information
| Project Identifiers | Project ID: 995242 DEA: 060Y1304 EFIS: 0619000010 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-33-40.4/59.3 |
| Award Date | 06/20/2024 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE HMA AND RHMA-G, AND REPLACE CULVERTS. |
| Location Description | KERN COUNTY ABOUT 8 MILES NORTH OF MCKITTRICK FROM CYMRIC WASH BRIDGE TO 0.8 MILE SOUTH OF ROUTE 46 |
| QA Service Level | 1 (Verified on 09/03/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jake.garcia@dot.ca.gov | Jake Garcia | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 181-190 of 561 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-25-3 | 09/25/2025 | 09/25/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-09-24-24 | 09/24/2025 | 09/24/2025 | Acceptance | Aggregate | View |
| 2025-09-24-23 | 09/24/2025 | 09/24/2025 | Acceptance | Soil | View |
| 2025-09-24-22 | 09/24/2025 | 09/24/2025 | Acceptance | Soil | View |
| 2025-09-24-21 | 09/24/2025 | 09/24/2025 | Acceptance | Soil | View |
| 2025-09-24-20 | 09/24/2025 | 09/24/2025 | Acceptance | Soil | View |
| 2025-07-14-126 | 07/14/2025 | 07/15/2025 | Quality Control | Concrete | View |
| 2025-07-09-116 | 07/09/2025 | 07/10/2025 | Quality Control | Concrete | View |
| 2025-07-03-57 | 07/03/2025 | 07/04/2025 | Quality Control | Concrete | View |
| 2025-06-05-112 | 06/05/2025 | 06/06/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
