Project Details
This page displays current information for project DEA: 081C08U4.
Project Information
| Project Identifiers | Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R134.0/R156.5 |
| Award Date | 06/22/2023 |
| Closeout Date | Not set |
| Work Description | PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB |
| Location Description | RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE |
| QA Service Level | 1 (Verified on 08/02/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Ryan.Luis.Espoy@dot.ca.gov | Ryan Espoy (cc on Reports) | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 171-180 of 411 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-03-73 | 04/03/2025 | 04/04/2025 | Quality Control | Concrete | View |
| 2025-04-02-64 | 04/02/2025 | 04/03/2025 | Quality Control | Concrete | View |
| 2025-04-01-40 | 04/01/2025 | 04/02/2025 | Quality Control | Concrete | View |
| 2025-07-10-96 | 07/10/2025 | 07/16/2025 | Verification | Asphalt Binder | View |
| 2025-07-18-57 | 07/18/2025 | 07/21/2025 | Quality Control | Concrete | View |
| 2025-07-15-101 | 07/15/2025 | 07/16/2025 | Quality Control | Concrete | View |
| 2025-07-14-90 | 07/14/2025 | 07/15/2025 | Quality Control | Concrete | View |
| 2025-07-11-45 | 07/11/2025 | 07/14/2025 | Quality Control | Concrete | View |
| 2025-07-10-95 | 07/10/2025 | 07/11/2025 | Quality Control | Concrete | View |
| 2025-07-09-89 | 07/09/2025 | 07/10/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
