Project Details
This page displays current information for project DEA: 06360244.
Project Information
| Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
| Award Date | 04/23/2021 |
| Closeout Date | Not set |
| Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Javier.Huerta@dot.ca.gov | Javier Huerta | Resident Engineer | Caltrans RE DB |
| ramandeep.guraya@dot.ca.gov | Ramandeep Guraya | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 171-180 of 1240 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-07-15-65 | 07/15/2024 | 07/24/2024 | Acceptance | Asphalt Binder | View |
| 2024-07-24-10 | 07/24/2024 | 07/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-24-9 | 07/24/2024 | 07/24/2024 | Quality Assurance | Soil | View |
| 2024-07-23-38 | 07/23/2024 | 07/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-23-37 | 07/23/2024 | 07/24/2024 | Acceptance | Aggregate | View |
| 2024-07-23-11 | 07/23/2024 | 07/23/2024 | Quality Assurance | Soil | View |
| 2024-07-22-21 | 07/22/2024 | 07/22/2024 | Quality Assurance | Soil | View |
| 2024-07-22-20 | 07/22/2024 | 07/22/2024 | Quality Assurance | Soil | View |
| 2024-07-22-19 | 07/22/2024 | 07/22/2024 | Quality Assurance | Soil | View |
| 2024-07-22-18 | 07/22/2024 | 07/22/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
