Project Details
This page displays current information for project DEA: 081C8504.
Project Information
| Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
| Award Date | 11/12/2020 |
| Closeout Date | 06/02/2025 |
| Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
| QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| ryan@pacificpros.com | Ryan Kash (Reports) | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 171-180 of 354 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-04-30-6 | 04/30/2023 | 05/08/2023 | Verification | Aggregate | View |
| 2023-04-30-4 | 04/30/2023 | 05/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-04-30-3 | 04/30/2023 | 05/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-04-30-1 | 04/30/2023 | 05/02/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-02-21-17 | 02/21/2023 | 02/21/2023 | Quality Assurance | Soil | View |
| 2023-02-21-16 | 02/21/2023 | 02/21/2023 | Quality Assurance | Soil | View |
| 2023-02-16-29 | 02/16/2023 | 02/16/2023 | Quality Assurance | Soil | View |
| 2023-02-16-28 | 02/16/2023 | 02/16/2023 | Quality Assurance | Soil | View |
| 2022-10-24-53 | 10/24/2022 | 10/26/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-10-24-51 | 10/24/2022 | 10/26/2022 | Department Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
