Project Details
This page displays current information for project DEA: 053307A4.
Project Information
| Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
| Award Date | 02/16/2022 |
| Closeout Date | 09/02/2025 |
| Work Description | Cholame Segment |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| andrew.borrelli@dot.ca.gov | Andrew Borrelli | Resident Engineer | Caltrans RE DB |
| david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 171-180 of 1433 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-29-32 | 11/29/2023 | 11/29/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2023-11-29-31 | 11/29/2023 | 11/29/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2023-12-05-46 | 12/05/2023 | 12/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-12-05-45 | 12/05/2023 | 12/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-12-11-24 | 12/11/2023 | 12/11/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2023-12-04-32 | 12/04/2023 | 12/04/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-12-01-37 | 12/01/2023 | 12/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-12-01-36 | 12/01/2023 | 12/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-12-01-35 | 12/01/2023 | 12/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-11-30-47 | 11/30/2023 | 11/30/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods