Project Details
This page displays current information for project DEA: 07288604.
Project Information
| Project Identifiers | Project ID: 208945 DEA: 07288604 EFIS: 0700021080 COOP: 074663 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-710-6.0-9.4 |
| Award Date | 09/02/2011 |
| Closeout Date | Not set |
| Work Description | Gerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing. |
| Location Description | Port of Long Beach (District 7) |
| QA Service Level | 1 (Verified on 06/03/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| sami.deeb@dot.ca.gov | Sami Deeb | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 161-170 of 511 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-05-09-2 | 05/09/2018 | 05/14/2018 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2018-04-24-37 | 04/24/2018 | 05/02/2018 | Quality Assurance | Concrete | View |
| 2018-04-24-36 | 04/24/2018 | 05/02/2018 | Quality Assurance | Concrete | View |
| 2018-04-24-35 | 04/24/2018 | 05/02/2018 | Quality Assurance | Concrete | View |
| 2018-04-24-34 | 04/24/2018 | 05/02/2018 | Quality Assurance | Concrete | View |
| 2018-04-24-33 | 04/24/2018 | 05/02/2018 | Quality Assurance | Concrete | View |
| 2018-04-18-5 | 04/18/2018 | 04/20/2018 | Quality Assurance | Concrete | View |
| 2018-03-28-16 | 03/28/2018 | 04/02/2018 | Quality Assurance | Concrete | View |
| 2018-04-17-9 | 04/17/2018 | 04/20/2018 | Quality Assurance | Concrete | View |
| 2018-04-17-8 | 04/17/2018 | 04/20/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
