Project Details
This page displays current information for project DEA: 060U5004.
Project Information
| Project Identifiers | Project ID: 1000113 DEA: 060U5004 EFIS: 0615000300 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-5-10.2/16.0 |
| Award Date | 08/29/2024 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT (RSC), HMA (TYPE A) AND RHMA (GAP GRADED). |
| Location Description | KERN COUNTY AT AND NEAR WHEELER RIDGE FROM GRAPEVINE UNDERCROSSING TO ROUTE 5/99 SEPARATION |
| QA Service Level | 1 (Verified on 02/26/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| robert.decker@dot.ca.gov | Robert Decker | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 161-170 of 316 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-07-35 | 05/07/2025 | 05/08/2025 | Acceptance | Concrete | View |
| 2025-05-07-34 | 05/07/2025 | 05/08/2025 | Acceptance | Concrete | View |
| 2025-05-06-42 | 05/06/2025 | 05/07/2025 | Acceptance | Concrete | View |
| 2025-05-06-41 | 05/06/2025 | 05/07/2025 | Acceptance | Concrete | View |
| 2025-05-06-40 | 05/06/2025 | 05/07/2025 | Acceptance | Concrete | View |
| 2025-05-05-46 | 05/05/2025 | 05/06/2025 | Acceptance | Concrete | View |
| 2025-05-05-45 | 05/05/2025 | 05/06/2025 | Acceptance | Concrete | View |
| 2025-05-05-44 | 05/05/2025 | 05/06/2025 | Acceptance | Concrete | View |
| 2025-05-08-16 | 05/08/2025 | 05/09/2025 | Acceptance | Aggregate | View |
| 2025-05-04-3 | 05/04/2025 | 05/05/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods