Project Details
This page displays current information for project DEA: 060X3004.
Project Information
| Project Identifiers | Project ID: 995124 DEA: 060X3004 EFIS: 0618000051 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-33-69.4/71.5 |
| Award Date | 02/06/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE ROADWAY PAVEMENT. |
| Location Description | FRESNO COUNTY IN AND NEAR FIREBAUGH FROM MORRIS KYLE DRIVE TO LYON AVENUE |
| QA Service Level | 1 (Verified on 10/25/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
| luis.guzman@dot.ca.gov | Luis Guzman | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 151-160 of 185 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-01-18 | 08/01/2024 | 08/01/2024 | Quality Assurance | Soil | View |
| 2024-07-31-19 | 07/31/2024 | 07/31/2024 | Quality Assurance | Soil | View |
| 2024-07-31-18 | 07/31/2024 | 07/31/2024 | Quality Assurance | Soil | View |
| 2024-07-30-15 | 07/30/2024 | 07/30/2024 | Quality Assurance | Soil | View |
| 2024-07-12-63 | 07/12/2024 | 07/19/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-07-16-28 | 07/16/2024 | 07/17/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-16-27 | 07/16/2024 | 07/17/2024 | Quality Assurance | Aggregate | View |
| 2024-07-15-9 | 07/15/2024 | 07/16/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-07-15-8 | 07/15/2024 | 07/13/2024 | Quality Assurance | Aggregate | View |
| 2024-07-12-30 | 07/12/2024 | 07/13/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
