Project Details
This page displays current information for project DEA: 080J0804.
Project Information
| Project Identifiers | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-15-34.7/51.6 |
| Award Date | 04/17/2017 |
| Closeout Date | Not set |
| Work Description | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT |
| Location Description | Riverside County and SBD-15-0.0/1.3 |
| QA Service Level | 1 (Verified on 05/08/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Roy.Fisher@parsons.com | Roy Fisher (reports) | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 151-160 of 361 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-11-07-7 | 11/07/2019 | 11/08/2019 | Quality Assurance | Concrete | View |
| 2019-11-06-4 | 11/06/2019 | 11/07/2019 | Quality Assurance | Concrete | View |
| 2019-10-15-21 | 10/15/2019 | 10/16/2019 | Quality Assurance | Concrete | View |
| 2019-11-14-10 | 11/14/2019 | 11/15/2019 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
| 2019-10-24-8 | 10/24/2019 | 10/25/2019 | Quality Assurance | Concrete | View |
| 2019-10-21-7 | 10/21/2019 | 10/23/2019 | Quality Assurance | Concrete | View |
| 2019-10-29-64 | 10/29/2019 | 11/05/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-10-29-63 | 10/29/2019 | 11/05/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-10-30-2 | 10/30/2019 | 11/01/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-10-03-14 | 10/03/2019 | 10/04/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
